Posted Rate

Connecticut single-trip oversize permit fee

$30 + $12

Source: CTDOT — Oversize/Overweight Permits

Effective date: Connecticut does not print one. We are not inventing one.

Checked 2026-08-21. Next check 2026-08-28.

That is the Connecticut single-trip base plus the printed electronic transmittal fee for one movement, from one origin to one destination. Loads over 200,000 lb add a printed engineering-analysis charge.

Official CTDOT page: “The base permit fee is $30.00 with an additional $12.00 electronic transmittal fee.” “Additionally, an “Engineering Analysis” fee will be applied to OS/OW Single Trip permits in excess of 200,000 lbs ($2.00 per each thousand pounds over 200,000 lbs).”

This page covers general single-trip permits. Annual divisible, annual indivisible, and the $25 radioactive permit are separate products.

When this number took effect

The CTDOT OS/OW page does not print an effective date for these fees. We are not inventing one.

Checked 2026-08-21 (PT) against the official CTDOT snapshot.

Source

CTDOT — Oversize/Overweight Permits

Nearby states: Massachusetts, New York, Rhode Island