Posted Rate

Missouri single-trip oversize permit fee

$15

Source: MoDOT — Special permit fees

Effective date: 2025 OSOW regulation book effective March 30, 2025.

Checked 2026-08-21. Next check 2026-08-28.

That is the Missouri single-trip oversize permit fee for one movement. Overweight through 160,000 pounds uses the printed add-on below.

Official fee PDF: “1. Single trip oversize permits —$15; 2. Single trip oversize permits in excess of sixteen feet (16’) wide, sixteen feet (16’) high, or one hundred fifty feet (150’) long— $15 plus $250 movement feasibility fee; 4. Single trip overweight permits up to and including one hundred sixty thousand (160,000) pounds gross weight—$15 plus $20 per each ten thousand (10,000) pounds in excess of legal gross weight;”

Single trip Fee
Oversize$15
Oversize over 16' wide, 16' high, or 150' long$15 plus $250 movement feasibility fee
Overweight through 160,000 lb GW$15 plus $20 per each 10,000 pounds in excess of legal gross weight

This page covers general single-trip permits. Loads over 160,000 pounds add a bridge and roadway analysis fee of $425 / $625 / $925 by mile band. That band is a separate product, not the general headline.

When this number took effect

The 2025 OSOW regulation book that reprints these fees is effective March 30, 2025. We are not inventing a different date.

Checked 2026-08-21 (PT) against the official MoDOT fee PDF snapshot.

Source

MoDOT — Special permit fees

Nearby states: Arkansas, Iowa, Illinois, Kansas, Kentucky, Nebraska, Oklahoma, Tennessee